Highly available design for a wide range of environments
Centralized Management
For example:Powerline adapter 1,
powerline adapter 2, establish the private network.
The steps of setting:
❶ Please keep pressing the Pair/Reset button of powerline adapter 1 for 1~3 seconds, the PLC light will blink.
❷ Please keep pressing the Pair/Reset button of powerline adapter 2 for 1~3 seconds in 2 minutes, the PLC light will blink. When PLC light of two powerline adapters changes into bright state normally, they establish the powerline network successfully.
For example: If the powerline adapter 1 and adapter 2 have established the private network N1, you want to add the powerline adapter 3 into N1.
The steps of setting:
❶ Please
keep pressing the Pair/Reset button of the powerline adapter, 3 for 1~3
seconds, its PLC
light will blink, which means the powerline adapter 3 is checking the network
N1.
❷ Please keep pressing the Pair/Reset button of the
powerline adapter 1 for 1~3 seconds in 2 minutes, its PLC
light will blink, which means they are pairing automatically.
The powerline adapter
3 adds into the private network N1 successfully when PLC
light should be on stably.
For example:The powerline adapter 1, adapter 2 and adapter 3 have established the private network, but the powerline adapter 3 disconnects the private network.
The steps of setting:
Please keep
pressing the Pair/Reset button of the powerline adapter 3 for up 6 seconds, its PLC
light will blink for three times, which means it disconnects the private
network and restores to the factory default setting.
OFF 4, L1, 108 Silverwater Rd, Silverwater NSW 2128